POS / PLV · since 1998

Haste is no enemy of print.

00:00,00
Skip to content
PLV / POSPortugal · since 1998
SectorsFMCG · Retail · Pharma
Average lead time 6 daysDeadlines met 92.7%
Portugal 00:00:00

We produce the most complex POS structures on the market. From technical drawing to delivery, with precision and deadlines met.

Technical sheet
01TypeDisplays · Islands · Special pieces · Store decoration
02MaterialsCardboard · PVC · PPA · Sustainable materials · Flexibles
03ScopeDrawing → production → installation

Positioning

For more than 25 years we have produced for the biggest brands. Today we are the choice for the most complex jobs, the ones that demand precision. Haste is no enemy of print.

01

Complex structures

Multi-material pieces, mechanisms, non-standard volumes. Where others see a production problem, we see a solution.

02

Technical rigour

Every project starts as a rigorous technical drawing. Dimensions, tolerances, cutting and assembly plans.

03

Project management

Full follow-up, from brief to installation. The client always knows what stage the job is at. Deadlines set are deadlines met.

Everything they say can't be done.

01Technical drawing and prototyping
02Multi-material production
03Nationwide logistics and installation

Drawn to the millimetre. Produced to scale. Delivered on time.

If it can be drawn, it can be produced.

Project
Homepage
Rev.
B
Scale
1:1
Period
1998–2026
Portfolio — project register
ClientType
Coca-Cola — Beverages
Coca-Cola — Entrance arch 01 Photo to come
TypeEntrance arch

See all projects

Production activity 364 days logged · 10 Nov 2025 – 7 Nov 2026
1,979Work orders
28,619 pcsDaily peak
129Active clients
2.5Items per work order
15Material families

Production matrix

Hover over the matrix to read each day
Operating indicators
Clients with 2 or more work orders57%
Shipments4,795
Mock-up rounds per item1.03
Delivery locations238
Shortest lead time deliveredSame day
Most used materials
Cardboard89%
Honeycomb board8%
Fluted PP2%
PVC0.5%
HIPS0.3%
Units shipped · 52 weeks▲ 10% work orders YoY
372 thousand

Pieces out of production, excluding promotional gifts and outsourced work.

See portfolio→
Average lead time4,688 items
6 days

From work order logged to finished piece.

Ask for a lead time for your project→
Key facts Company sheet · Rev. B
Founded1998
Years in operation28 years
Production area2,800 m²
Projects delivered+4,760
On-time delivery92.7%
SectorsFMCG · Retail · Pharma
Clients
Altavia
HH Global
Paragon Global Brands
Prime Drinks
Sumol+Compal
Vendap

Have a project that can challenge us?

That is exactly the one we want to see. Send us the drawing, the idea or the problem.